Developing Facilities
BDR is constantly evolving with the growing oil and gas
industry. Using our past experience with both conventional
and non-conventional oil and gas extraction methods their
list of projects continues to grow.
- 2007 - design and scheduled completion of several
oil batteries and compressor stations in Western Canada

- 2007 - design and planned commissioning of a 10,000
bpd facility in the Great Divide area of the tar sands in
Northern Alberta

- 2007 - design and commissioning of a heavy oil
development in South America

- 2007 - commissioning of a polymer injection enhanced
recovery facility in Saskatchewan

- 2006 - a 10,000 bpd steam assisted gravitation drain
(SAGD) facility in the Fort McMurray tar sands area
- 2006 - in 2005 and 2006 BDR provided EPCM services
for 13 facilities totaling 240mmscfd of gas handling
capacity.
- 2004 - 2006 - large scale pilot program for coalbed
methane production facilities
- 2005 - 50mW multi-fuel, medium voltage, power
generation and distribution facility in Ecuador
- 2004 - 1,200 bpd SAGD test facility, test facility
was for the main facility completed in 2006
- 2002 - design and commissioning of the world's
second largest polymer injection enhanced recovery
facility
More Information: (back to About BDR)

BDR
as an Organization

Design
and Engineering Services

Developing
Facilities for Non-Conventional Extraction Methods of Oil
and Gas
|
 |